Expert Guide: Professional Installation of Thermostatic Shower Mixers – Step-by-Step Instructions

Views: 0     Author: Site Editor     Publish Time: 2025-06-18      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Bathroom Thermostatic Shower Faucet Installation Diagram

1

Text Catalog

1. Installation Tools
2. Review Installation Dimension Diagram
3. Prepare Wall Slot Cutting
4. Shower Centerline Marking
5. Install In-wall Piping
6. Install Positioning Plate
7. Confirm Slot Cutting Dimensions
8. Laser Leveling Calibration
9. Piping Horizontal Calibration
10. Piping Vertical Calibration
11. Pressure Holding Test
12. Fix Water Pipes
13. Remove Shower Body Eccentric Connector
14. Determine Hole Drilling Dimensions
15. Install Eccentric Connector
16. Eccentric Connector Leveling
17. Position and Fix Shower Body
18. Connect Water Pipes
19. Install Shower Body Decorative Cover
20. Drill and Install Ceiling Showerhead
21. Drill and Install Handheld Shower Bracket
22. Connect Handheld Shower Hose
23. Installation Complete

2

1. Installation Tools

Prepare necessary tools for installation, including wrenches, screwdrivers, tape measures,pencil/markers, laser leveling tools, and pressure testing equipment.

3

2. Review Installation Dimension Diagram

Refer to the provided dimension diagram to understand the required measurements and layout for installation.

5

3. Prepare Wall Slot Cutting

Prepare the wall for slot cutting by marking the designated area based on the installation dimensions.

6

4. Shower Centerline Marking


Mark the centerline of the shower area to ensure the showerhead is installed at an optimal height and position.

7

5. Install In-wall Piping

Install the in-wall piping according to the marked layout, ensuring proper connections for hot and cold water supplies.

8

6. Install Positioning Plate

Attach the positioning plate to the wall, aligning it with the pre-marked installation dimensions.

9

7. Confirm Slot Cutting Dimensions

Verify the slot cutting dimensions to ensure they match the required specifications for the faucet installation.

10

8. Laser Leveling Calibration

Use a laser leveling tool to ensure the piping and installation plate are perfectly level.

11

9. Piping Horizontal Calibration

Calibrate the horizontal alignment of the piping to maintain accuracy during installation.

12

10. Piping Vertical Calibration

Ensure vertical alignment of the piping for a straight and secure installation.

13

11. Pressure Holding Test

Conduct a pressure holding test with a recommended pressure of 1.5 MPa to check for any leaks in the piping system.

15

12. Fix Water Pipes

Securely fix the water pipes in place, ensuring no movement or looseness.

16

13. Remove Shower Body Eccentric Connector

Remove the eccentric connector from the shower body for installation purposes.

17

18

14. Determine Hole Drilling Dimensions

Measure and mark the hole drilling dimensions on the tile, ensuring the size does not exceed Φ42mm.

19

15. Install Eccentric Connector

Install the eccentric connector with the opening facing upwards.

20

21

16. Eccentric Connector Leveling

Use a leveling tool to ensure the eccentric connector is perfectly horizontal.

23

17. Position and Fix Shower Body

Position the shower body and secure it in place using the appropriate fixings.

24

18. Connect Water Pipes

Connect the water pipes to the shower body, ensuring tight and leak-free connections.

25

26

27

19. Install Shower Body Decorative Cover

Attach the decorative cover to the shower body for a finished look.

28 1

20. Drill and Install Ceiling Showerhead

Drill the required hole and install the ceiling showerhead.

32 1

21. Drill and Install Handheld Shower Bracket

Drill the hole and install the bracket for the handheld shower.

36

22. Connect Handheld Shower Hose

Connect the handheld shower hose to the bracket and ensure it functions smoothly.

37

23. Installation Complete

Conduct a final inspection to ensure all parts are properly installed and functioning correctly.



Heshan city, Guangdong, China
+86 ​​​​​​​18930489806

Info@aquacubic.com.cn

OUR PRODUCTS

CONTACT US

More >>
  928, 128 Ji Nian Road, Baoshan District, 
      Shanghai, China.
  0086-21-61172575
  0086-18930489806
  info@aquacubic.com.cn
Copyright © 2021 AQUACUBIC All Rights Reserved  sitemap